top of page

The Kitchen Refurb

Client review : "The Zeke team completly stripped out the old kitchen. Levelled floor and installed new flooring. New kitchen installed together with associated carpentry, tiling, plumbing work, plastering and painting. Plus new electrical wiring and fuse box. I am very satisfied, all the work was done to a high standard. Kitchen looks very good and works well."

The Kitchen refurb

Royal Military - Bespoke Tower clock door

The clock tower access door severely rotten ( as can be seen in the first image to pieces,replaced by a needed long lasting design.

Royal ⚔ Military

Bathroom & Shower room restored
Leakage damaged

Bathroom & Shower room restored

Cause : defective shower valve.

20201102_150107

20201102_150107

20201103_101634

20201103_101634

20201112_142253

20201112_142253

20201125_145548

20201125_145548

20201126_160310

20201126_160310

20201130_162328

20201130_162328

20201125_145609

20201125_145609

20201211_150542

20201211_150542

20201211_150553

20201211_150553

20201211_153351

20201211_153351

20201215_175717

20201215_175717

20201126_160339

20201126_160339

20201211_153405

20201211_153405

Chelsea Barracks
Chealsea Barracks
 

Works carried on a Historical Building.

20220411_095429

20220411_095429

20220412_135718

20220412_135718

20220411_151046

20220411_151046

20220412_105729

20220412_105729

20220412_100403

20220412_100403

20220411_155043

20220411_155043

20220412_135748

20220412_135748

20220411_155019

20220411_155019

20220413_155404

20220413_155404

20220413_152151

20220413_152151

20220413_152203

20220413_152203

20220413_155341

20220413_155341

White Structure

Contact Us

+44 7743570481

Thanks for submitting!

Contact
    bottom of page